Yesterday was the day set aside to install hardwood flooring in Azure's bedroom. Get the last of the carpet out of the front part of the house. We had already cleaned her room up, and cleared out the closet, so Boyd and Ben spent the morning moving out the large furniture and taking out the carpet. I went to get my allergy shot. In the afternoon Boyd and I put down the hardwood, with Ben standing by to run errands. The floor looked great, although I did bruise my toe at one point (when Boyd slipped and fell into me, actually,) in general the work went rather well.
But then Jasmine threw-up, twice, and by breakfast time this morning, Boyd, Lisandra and I were the only people in the house who hadn't dumped the contents of our stomaches on the floor at least once. In addition to that, when Boyd went out to do errands the car died on him.
Niether Boyd or myself are feeling particularly good either, and frankly we've pretty much written today off.
Although, Azure's floor really does look nice
Leave a Reply
You must be logged in to post a comment.